Process

  1. 1

    Brief

    You send the show details: rig, crew, dates, destination. Rider, plot or patch if you have them. We reply within 48 hours.

    • Email or call
    • NDA on request
  2. 2

    Design

    Rack elevations, patch and IP plan, signed off by you before parts are ordered.

    • Rack elevations
    • Patch
    • IP plan
    • Quote
    EXAMPLE DRAWING · FRONT · 6U19"654321FIBRE PATCH1UCORE SWITCH · A1UCORE SWITCH · B1UART-NET / SACN NODES1UPATCH PANEL · ETHERCON1UBLANK1U
  3. 3

    Build and burn-in

    Built, wired and labelled in Antwerp. Every port, backup and failover is tested before it ships.

    • Assembly
    • Labelling
    • Burn-in
    • Test report
    Photo · credit to come
  4. 4

    Documentation

    Labels, patch sheets, IP plan and handover document. The QR code on the maker's plate links to them at persistencebuilds.com.

    • Labels
    • Patch sheets
    • IP plan
    • Handover document
    Photo · credit to come
  5. 5

    Delivery

    Packed in cases and shipped to the venue, warehouse or rehearsal space, with export paperwork. Incoterms per project.

    • Freight
    • Insurance
    • Export documents
  6. 6

    Aftercare

    Remote support, changes and spares after delivery. Drawings are kept for the next tour.

    • Remote support
    • Changes
    • Spares

Questions

How long does a build take?

It depends on the gear. The ship date is in the quote.

Where do you ship?

Worldwide, from Antwerp. Incoterms per project.

Do you sign NDAs?

Yes. Tick the box on the form and we send one first.

What is the warranty?

Equipment: the manufacturer's warranty. Assembly, wiring and labelling: our terms.

Can we supply our own gear?

Yes. We source it, build around yours, or both.

What do you build?

Touring systems, lighting, video and network racks, and studios and control rooms.